Limited Production
THE PROBLEM A machine shop was turning down the surface of a round that had a special plating applied and wanted to utilize a new Haas automated turning center, but
THE PROBLEM A machine shop was turning down the surface of a round that had a special plating applied and wanted to utilize a new Haas automated turning center, but
THE PROBLEM A chemical manufacturing customer developed a brand new product years ago and has gone through three different types of machines in an effort to find the most efficient
THE PROBLEM Packaging at the end of a processing line was labor intensive and could lead to quality issues especially with new operators. Parts could vary from 500mm up to
THE PROBLEM Assembly of garage door hinges at customer’s facility required significant dexterity and would lead to diminished outputs as shifts progressed due to operator fatigue. THE PD&B SOLUTION The
THE PROBLEM Pick n Place steel blanks A blanking customer needed to reduce labor and increase production rates in a steel blanking business. THE PD&B SOLUTIONPD&B hit the ground running
THE PROBLEMUnable to Effectively Integrate with Third-Party Coating Line. The client manufactures aluminum tubing for HVAC systems. They needed new equipment designed and built to uncoil, guide, inspect, mark, size